The shape of things to come............
Six hundred and eighty two rail chairs later, all the track has now been laid, wired, tested and awaits a little cosmetic detailing, before ballasting takes place.
This is the view from the bridge approach road, and now that the layout is operational I'll be turning my attention to the bridge itself.
Six hundred and eighty two rail chairs later, all the track has now been laid, wired, tested and awaits a little cosmetic detailing, before ballasting takes place.
This is the view from the bridge approach road, and now that the layout is operational I'll be turning my attention to the bridge itself.